[:de]Als eines der größten Windgutachterbüros in Deutschland bieten wir neben Wind- und Ertragsgutachten eine Vielzahl verwandter Dienstleistungen, die im Folgenden näher erläutert werden.  Zur Veranschaulichung haben wir hier einige relevante Arbeitsbeispiele für Sie abgebildet.

Zudem finden Sie in dieser Rubrik Informationen zum Qualitätsmanagement der aj.[:en]

As one of the largest teams of independent wind consultants in Germany we offer wind resource and energy production assessments as well as related services of which an overview is given on the following pages. In addition, some relevant examples are presented here.

 

[:]

[:de]Wind- und Ertragsgutachten[:en]Wind resource and energy production assessments[:]

[:de]In Wind- und Ertragsgutachten werden die mittleren Windverhältnisse an geplanten Windkraftstandorten und die im langjährigen Mittel zu erwartenden Energieerträge von geplanten oder im Bau befindlichen Windparks bestimmt. Sie sind eine entscheidende Grundlage für die Verhandlungen zwischen Projektinitiatoren, Projektentwicklern, Investoren, Finanzierern und auch Anlagenherstellern.

aj ist für den Bereich Wind- und Ertragsgutachten nach DIN IEC 17025 akkreditiert.

Die Wind- und Ertragsgutachten der aj gelten am Markt als besonders zuverlässig und aussagekräftig und werden von Banken problemlos akzeptiert.

Die Windverhältnisse werden in Deutschland in der Regel aus Mesoskalendaten in Verbindung mit den Energieerträgen bestehender Windkraftanlagen der Umgebung abgeleitet, während im Ausland (und zunehmend auch in Deutschland) vor Ort durchgeführte Windmessungen als Basis herangezogen werden. Hierzu müssen die Energieerträge bzw. die Windmessdaten auf langjährige mittlere Verhältnisse projiziert und von den Positionen der bestehenden Anlagen bzw. der Windmessung auf die geplanten Anlagenpositionen und Nabenhöhen übertragen werden.

Eine besonders ausgeprägte Erfahrung hat aj in der Prüfung vorliegender Ertrags- und Windmessdaten auf Plausibilität, Störungen, Datenfehler und Fehlinformationen. Es werden stets alle verfügbaren Informationen verwendet, um ein möglichst vollständiges Bild des Strömungsfeldes zu erhalten. Dieser konsequent verfolgte Ansatz ist ein Alleinstellungsmerkmal der aj am Markt und ermöglicht besonders niedrige Unsicherheiten.

Beim Bezug auf langjährige Verhältnisse werden mehrere verschiedene Datenquellen, häufig sogar etwa zehn Datenquellen mit drei bis vier grundsätzlich verschiedenen Arten verwendet. Für Deutschland werden eigene Produktionsindices erarbeitet, die eine unabhängige Kontrolle der BDB-Indices darstellen. Windmessdaten werden mit einem hoch differenzierten, selbst entwickelten Verfahren langfristextrapoliert. Schon seit dem Jahr 2000 verfolgt aj beim Langfristbezug die Grundsätze, die erst mit der Technischen Richtlinie 6 (TR 6) des Jahres 2014 in der Branche allgemein eingeführt wurden. So zeigt sich, dass sich die Ergebnisse des Langfristbezugs bei aj im Lauf der Jahre weniger geändert haben als bei vielen anderen Firmen. Änderungen z.B. des BDB-Index haben sich bei aj immer nur wenig ausgewirkt.

Die Strömungsmodellierung basiert größtenteils auf den Meskoskalendaten, bevorzugt aber auf Windmessdaten vom Standort oder auf SCADA-Daten von Windkraftanlagen der Umgebung, da diese nochmals realistischere Ergebnisse ermöglichen. Die früher fast ausschließlich genutzen Wetterstationsdaten werden mittlerweile nicht mehr verwendet.

Die jeweils aktuelle Technische Richtlinie 6  der Fördergesellschaft Windenergie und andere Dezentrale Energien wird von aj befolgt, soweit dies sinnvoll bzw. praktikabel ist.[:en]

The purpose of wind resource and energy production assessments is to determine the mean wind resource of sites and the long term mean annual energy production of wind farms that are planned, under construction or in operation. These assessments are the basis for the negotiations between project initiators, developers, investors, financing parties and turbine manufacturers.

On the market, the wind resource and energy production assessments elaborated by aj are considered as particularly reliable and well explained. Banks welcome our reports particularly.

In Germany, the standard approach is to derive the wind resource from the energy production of existing wind turbines in the surroundings, whilst site specific wind measurements are used as a basis in other countries (but also increasingly in Germany). The production data respectively the wind data used in these cases must be scaled to long term mean situations and then transferred from the positions of the existing turbines respectively the wind measurement to the planned turbine positions and their hub heights.

aj is particularly experienced in the in-depth check of available production and wind data on plausibility, disturbances, technical faults and erroneous information. Any available information is used (e.g. not only from the top anemometer of the mast but from all anemometers), in order to obtain the most complete picture of the wind flow. This approach, which is pursued on all levels and matters, is the most relevant particularity of aj on the market and allows us to achieve lower than common uncertainties.

To scale the existing data to the long term, data and procedures developed in house are used as well as data sets which are readily available on the market, as appropriate. Standard software tools are used for the extrapolation in space and for the production calculations. Detailed plausibility checks are considered highly important in this context. If experience or general considerations suggest that the most realistic results differ from those obtained with the calculation programs, corrections are applied in order to get closest possible to reality and to minimise the uncertainty.

When scaling data to the long term, a number of reference data sources are used in parallel, often even about 10 sources across three or four fundamentally different kinds. For Germany, own production indices are elaborated and permanently updated which are based on the operational data of long term operational wind turbines. These indices allow for verifying the common BDB indices independently. Wind speed data are extrapolated to the long term using an own, very detailed procedure. The results of long term extrapolations of aj have changed less over the years than those of many other companies. Changes in particular reference data sources usually affect our results only to little extent.

The wind flow modelling is preferably based on on-site wind data or on SCADA data of wind turbines in the region, since this leads to more realistic results than met station data.

The Technical Guideline no. 6 of the Fördergesellschaft Windenergie und andere Dezentrale Energien is followed by aj as far as this is sensible and feasible.

[:]

[:de]Standortgütenachweise [:en]Short assessments[:]

[:de]

aj ist für die Erstellung von Standortgütenachweisen gemäß EEG 2017 und die Bestimmung des Referenzertrages nach DIN IEC 17025 akkreditiert.

Die Nachweise werden auf Basis eines aktuell gültigen Wind- und Ertragsgutachtens und der aktuell gültigen Normen und Richtlinien erstellt.

 

 

 

 

 

 

 

 

 

 [:en]

At a very early stage of the planning process, a very reasonable step may be to pre-evaluate the site or the region with respect to the wind resource and further relevant aspects. Through this, the first strategic decisions can be made very easily and at a very cost-efficient level before the costly processes like wind measurements, contracts or further approvals need to be scheduled.

With respect to the current tenders, these short estimates on the basis of a short term wind measurement can provide an immense strategic benefit. Already after a measuring period of approx. 3 months, a sufficient reliable evaluation with regard to the energy production is possible. Particularly, the frequency distributions of both the wind speed and the wind direction as well as the turbulence intensity can be determined very precisely via these short term measurements so that further decisions about the planned turbine type, the layout of the wind farm or the load on the turbines can be concluded from that.

Whilst the wind energy production of a wind farm can only be predicted reliably on the basis of at least one year of on-site or near-site data (i.e. measured wind data or production of nearby wind turbines), it is often strategically beneficial to decide upon the turbine type and wind farm layout at a relatively early stage of development, i.e. before the wind resource is well known. For this purpose, aj offers early stage site condition assessments and wind farm lay-out studies. If a wind measurement has been lasting for a few months, the relevant parameters can often already be determined with the accuracy necessary for this purpose. Of course, seasonal effects must be taken into account in these cases. If a wind resource study is based on production data of nearby turbines, aj determines the most uncertain parameters on the safe side specifically for this purpose, which will allow for acquiring a building permission on safe grounds.

At aj, the short estimates are based on production data of existing wind turbines in the surroundings of the planned site. Thus, the same procedure is used as in full wind resource and energy production assessment reports which is much more reliable as carrying out short estimates on the basis of model calculations only. Through this, potential risks can be identified much easier and additional steps, such as wind measurements or the need for production data of further turbines, can be planned, if necessary, much earlier.

[:]

[:de]Windmessungen[:en]Wind measurements [:]

[:de]

Mitarbeiter der aj verfügen über eine mehr als 35-jährige Erfahrung in der Messtechnik für Windenergie. Die Duchführung von Windmessungen ist mittlerweile eine der  Hauptaktivitäten der aj. In Deutschland werden hierfür überwiegend Sodargeräte verwendet, weil die von aj ausgewählten Geräte besonders zuverlässig sind und das beste Preis-/Leistungsverhältnis für Windmessungen bieten.

Seit kurzem hat aj zusätzlich Windmessungen mittels eigener Lidargeräte in sein Portfolio aufgenommen. Dies ermöglicht eine noch projektspezifischere Planung der Messstrategie.

aj ist für den Bereich Windmessungen mit Sodar- und Lidargeräten nach DIN IEC 17025 akkreditiert.

Mittlerweile befinden sich somit 12 hochwertige Sodargeräte der Typen AQ500 und AQ510 WindFinder des Herstellers AQSystem sowie 2 Windcube-Lidargeräte im Besitz der aj. Alle Geräte sind in verschiedensten Landschaften durchgängig im Einsatz. Betriebsergebnisse errichteter Windparks bestätigen die  aj-Gutachten, die auf Basis von Sodar-Windmessungen durchgeführt wurden!

Kurzzeitige Windmessungen sind mit Sodargeräten kurzfristig und günstig durchführbar und liefern hinreichend belastbare Grundlagen im Rahmen der Ausschreibung (siehe Kurzeinschätzungen).

Auch zur schnellen und kostengünstigen Überprüfung des Leistungsverhaltens von Windkraftanlagen setzt aj Sodargeräte ein und hat damit bereits zu Ertragssteigerungen beigetragen!

Schon seit 2003 führt aj Windmessungen mittels Messmasten im In- und Ausland durch. Hierbei erzielt aj selbst unter extremen Standortbedingungen hohe Datenqualität und –verfügbarkeit.

Eine gute Messstrategie ist essenziell für eine erkenntnisreiche und für alle Seiten gewinnbringende Windmessung. aj berät Sie in allen Fragen der Messstrategie. Dazu gehören insbesondere:
  • die Auswahl des Messstandortes: Dieser hat einen großen Einfluss auf die Unsicherheit des Wind- und Ertragsgutachtens!
  • die Auswahl des Messgerätes (Sodar, Lidar, Mast mit Schalenkreuzanemometer, Ultraschallanemo-meter, Propelleranemo-meter,…)
  • die Dauer der Messung
  • die Zahl der Messpositionen
  • den Einbezug und die Ausbildung örtlicher Arbeitskräfte

Die Überwachung und Dokumentation von Windmessungen kann sowohl durch aj erfolgen als auch durch Sie nach Ausbildung Ihrer Mitarbeiter bei unseren Schulungen. Neben dem notwendigen Know-How versorgt aj Sie gerne mit dem nötigen Equipment zur Durchführung der Windmessung.

Neben Windmessungen zur Ermittlung des Windpoten-zials verfügt aj über umfassende Erfahrung in:

  • Verifikation von Fernmessgeräten
  • Belastungsmessungen
  • Kalibration von Belastungsmessungen

 

 

 

 

 

 

 

 

[:en]

The staff of aj profits from more than 30 years of experience in measurement techniques for wind energy. In the meanwhile, wind measurements have become one of our core activities. In Germany, we mainly use Sodar instruments for this purpose, since the instruments selected by aj are particularly reliable and offer the best cost/benefit ratio for wind measurements at large heights. In the meanwhile, aj owns 10 high quality Sodar instruments of the types AQ500 and AQ510 WindFinder of the manufacturer AQSystem. These are permanently in operation in a large range of landscapes. The operational results of several wind farms confirm the results of aj wind resource assessments based on our Sodar measurements!

All Sodar instruments owned by aj have been verified against met masts, some of them even repeatedly. The Sodar wind measurements of aj are in agreement with the requirements of the German TR 6 guideline.

Short term wind measurements with Sodar instruments deliver fast and at low cost important initial information for first estimates and many aspects of strategy finding.

aj also uses Sodar instruments for fast and cost efficient verification of the power performance of wind turbines. With this, aj has already contributed to the improvement of power performance.

Since 2003, aj performs met mast based wind measurements both in Germany and outside of Germany. Even under extreme site conditions, aj achieves high data quality and availability.

The measurement strategy is an essential element for a successful wind measurement that best serves its purpose. aj provides advice on all aspects of measurement strategies, among others

  • Selection of the measurement location: This influences the uncertainty oft he wind resource assessment tremendously!
  • Definition of the measurement system (Sodar, Lidar, mast with cup anemometer, ultrasonic anemometer, prop vane, …)
  • Duration of the measurement campaign
  • Number of measurement positions
  • Integration and training of local stuff

The wind measurement may be supervised and documented either by aj or by your staff after our training. Besides transferring our know how, we can provide any necessary equipment for performing the wind measurement.

Besides wind measurements to determine the wind resource, aj has extensive experience in:

  • Verification of remote sensing instruments
  • Load measurements
  • Calibration of load measurements

[:]

[:de]Kurzeinschätzungen[:en]Operational behaviour of wind turbines[:]

[:de]

In einem frühen Projektstadium ist es für Planer oder Investoren häufig sinnvoll, eine Vorevaluierung eines Standortes bzw. einer Region vornehmen zu lassen. Dies ermöglicht schnell und kostengünstig erste strategische Entscheidungen vor den ersten kostenträchtigen Schritten wie Windmessung, Abschluss von Verträgen oder Einholen von Gutachten und Genehmigungen.

Bei aj basieren die Kurzeinschätzungen genauso wie Wind- und Ertragsgutachten auf den Erträgen umliegender Windkraftanlagen und sind damit zuverlässiger als Einschätzungen auf Basis von Modellrechnungen. Auf diese Weise können frühzeitig Projektrisiken identifiziert und ggf. notwendige Schritte wie die Akquise von Betriebsdaten oder die Planung einer Windmessung identifiziert werden.

Im Rahmen der Ausschreibung können Einschätzungen auf Basis kurzzeitiger Windmessungen ernome strategische Vorteile bieten.

Schon nach etwa 3 Monaten Messung ist häufig eine hinreichend belastbare Ertragsaussage möglich. Vor allem können dann schon Windrose, Häufigkeitsverteilung und Turbulenz so belastbar ermittelt werden, dass Anlagentyp und Windparklayout entschieden und Standsicherheitsnachweise belastbar erstellt werden können.
Eine Besonderheit am Markt stellen die aj-Kurzeinschätzungen für Standsicherheitsnachweise dar. Einschätzungen des Windpotenzials zur wirtschaftlichen Einordnung sind zu unsicher, um als Basis für Baugenehmigungen zu dienen. Zudem entsprechen sie keinem Stand der Technik. Wird jedoch eine Kurzeinschätzung bewusst konservativ hinsichtlich des Standsicherheitsnachweises angelegt, ist sie diesbezüglich ausreichend belastbar und dennoch bleibt der Aufwand gering.

 [:en]

Over many years, aj has acquired an extraordinary extent of experience in the analysis of the operational behavior of wind turbines in order to, e.g.

  • Identify those turbines in a wind farm that are performing less than others
  • Identify possibilities to improve the performance of existing turbines
  • Quantify the impact of certain measures on the energy production such as improvements of the turbine, curtailments or temporary reduction of power
  • Improve the understanding of operational behavior
  • Improve the understanding of the wind field, e.g. in complex terrain or in and around wind farms

If needed, aj performs additional measurements on or near the turbines for this purpose.

This area of activity displays well the innovative and flexible spirit of aj and uses fully its broad background on wind turbines and wind fields.

[:]

[:de]Betriebsverhalten von Windkraftanlagen[:en]Production analysis of operating wind farms[:]

[:de]aj verfügt über eine außerordentliche Erfahrung in der Untersuchung des Betriebsverhaltens von Windkraftanlagen, um z.B.

  • Optimierungsmöglichkeiten der bestehenden Anlagen zu ermitteln
  • Ursachen für unbefriedigende Energieerträge zu ermitteln
  • Ertragseinbußen oder -gewinne durch bestimmte Maßnahmen oder Vorgänge wie Anlagenverbesserungen, Abschaltungen und temporäre Drosselungen zu quantifizieren
  • Das Verständnis des Betriebsverhaltens zu verbessern
  • Das Verständnis der Windverhältnisse, z.B. in komplexem Gelände oder in großen Windparks, zu verbessern
Bei diesen Tätigkeiten kommen die Flexibilität, der Ideenreichtum und das ausgiebige Verständnis über das Verhalten von Windkraftanlagen der aj voll zum Tragen.

[:en]

Which long term energy production does your wind farm yield in reality? aj determines this based on the recorded operational data, often using the 10 minute SCADA data. As part of this work, the energy lost in the past due to failures or other downtime (e.g. curtailments) is quantified in detail. If possible, the long term electrical losses are also derived from past data.

[:]

[:de]Ertragsgutachten für Bestandsparks [:en]Optimization of the wind farm layout[:]

[:de]

Welchen Langfristertrag erzielt der Windpark wirklich? aj ermittelt dies auf der Basis der registrierten Betriebsdaten, häufig unter Einbezug der hoch aufgelösten SCADA-Daten. Dabei werden auch die Ertragsverluste der Vergangenheit aufgrund von Störungen und Stillständen bzw. Drosselungen sowie die elektrischen Übertragungsverluste detailliert quantifiziert.

[:en]

In many cases, the energy output of a planned wind farm could be maximised through optimizing the lay-out of the wind farm. This can be achieved without additional load on the wind turbines. The long term experience of aj in the operational behaviour of wind turbines can be used here to elaborate optimized lay-outs which also take into account general requirements such as an elegant appearance, low infrastructure cost etc. Often solutions can be found which lead to a noticeable gain of energy yield for relatively little cost.

[:]

[:de]Parkoptimierungen[:en]Due diligence assessments [:]

[:de]Häufig kann der Energieertrag durch Änderungen des Parklayouts erhöht werden, ohne dass dadurch die Lebensdauer der Anlagen leiden muss. Die langjährige Erfahrung der aj in der Untersuchung des Betriebsverhaltens von Windkraftanlagen kann hier genutzt werden, um optimierte Aufstellungskonzepte zu erarbeiten, die auch allgemeinen Anforderungen wie z.B. einem eleganten Erscheinungsbild, kurzen Betriebswegen etc. Rechnung tragen. Häufig werden mit relativ geringem Aufwand Lösungen gefunden, die einen spürbaren Ertragsgewinn bringen.[:en]

Due to its long term experience, aj is especially qualified to evaluate a project with respect to site suitability, wind resource and energy assessment at every single stage of the planning process. In this framework, aj offers project specific flexible approaches which are focussed on the results.

[:]

[:de]Due diligence-Prüfungen[:en]Site suitability assessments[:]

[:de]

Selbstverständlich ist aj mit seiner umfassenden Erfahrung prädestiniert, Projekte in jedem denkbaren Stadium oder auch ggf. schon vorliegende Gutachten je nach gewünschter Bearbeitungstiefe hinsichtlich Windverhältnissen, Energieerträgen, und Standorteignung zu bewerten.

Hier bietet aj projektspezifisch flexible und ergebnisorientierte Vorgehensweisen.

[:en]

With its background on turbine design and operational behaviour of wind turbines on the one hand and its experience on wind fields, in particular from the examination of wind measurements on the other, aj delivers site suitability assessments which consider all relevant aspects realistically and competently. This includes issues which may be relevant but have not been considered in current standards. Often, it is beneficial for the constructive progress in a project if aj liaises directly with the site assessment department of the wind turbine manufacturer in question. aj has even provided advise to turbine manufacturers in this context at several opportunities.
 
 
 

[:]

[:de]Standsicherheitsnachweise[:en]Research[:]

[:de]

Aufgrund des umfassenden Erfahrungshintergrundes im Bereich der Anlagenentwicklung einerseits und aufgrund einer Vielzahl an Windmessungen andererseits, liefert aj Standsicherheitsnachweise, die alle relevanten Aspekte kompetent und realistisch berücksichtigen.

Für diesen Bereich ist aj nach IEC 17025 akkreditiert.

Bei Bedarf erfolgt eine enge und effiziente Abstimmung mit dem Anlagenhersteller oder Zertifizierer. Mehrfach hat aj sogar Anlagenhersteller in dieser Hinsicht beraten.

 [:en]

aj permanently carries out research, often at own cost, to improve the quality of the work. Research topics were in the past, e.g.

  • Energy losses due to curtailments for the protection of bats
  • Use of the turbine’s own wind speed data to determine energy losses
  • Long term stability of the wind speed in reanalysis data
  • Data for the long term reference / wind index
  • Long term reference, long term variability of the wind resource
  • Wind speed profiles
  • Frequency distributions at large hub heights
  • Influence of forest on the wind speed profile and the energy output of wind turbines
  • Influence of the shape of the terrain on the energy output
  • Thermally driven winds
  • Wind measurement, wind measurement instruments, measurement of turbulence
  • Power curves and turbine behaviour
  • Wind farm effects

[:]

[:de]Forschung[:en]Trainings[:]

[:de]

aj führt ständig, häufig auch auf eigene Kosten, Forschungen durch, um die Qualität der Arbeit zu verbessern. Forschungsthemen der Vergangenheit sind z.B.

  • Ertragsverluste wegen Betriebsbeschränkungen zum Schutz von Fledermäusen
  • Nutzung der anlageneigenen Anemometer zur Ermittlung von Ertragsverlusten
  • Stabilität der Windinformation in Reanalysedaten
  • Daten für Langzeitbezug / Windindex
  • Verfahren für den Langzeitbezug
  • Variabilität des Windes
  • Höhenprofil der Windgeschwindigkeit
  • Häufigkeitsverteilungen bei großen Nabenhöhen
  • Einfluss von Wald auf das Höhenprofil und den Energieertrag von Windkraftanlagen
  • Einfluss von Geländeformen auf den Energieertrag
  • Windmessung, Windmessgeräte, Turbulenzmessung
  • Leistungskennlinien und Leistungsverhalten
  • Windparkeffekte
  • Thermisch bedingte Winde

[:en]

aj is happy to dissipate the know-how that has been achieved and has therefore carried out training on a large range of topics. The emphasis was on the evaluation of wind resource assessments (for developers, investors and financing parties) and measurement techniques.

[:]

[:de]Capacity Building[:en]Qualitätsmanagement [:]

[:de]aj gibt gerne das erarbeitete Know-how weiter und hat daher zahlreiche Schulungen zu unterschiedlichsten Themen durchgeführt. Schwerpunkte sind dabei die Beurteilung von Windgutachten (für Planungsbüros, Investoren und Finanzierer) und der Bereich der Messtechnik.

 [:en]Effiziente Lösungen auch bei komplexen Aufgaben, zusammen mit unserem einzigartigen Sodar-Expertenwissen und einer hohen Genauigkeit bei Gutachten sind seit jeher Qualitätsmerkmale der aj.

Im Jahre 2018 wurde der anemos-jacob GmbH erstmals die Akkreditierung durch die Deutsche Akkreditierungsstelle (DAkks) nach DIN EN ISO/IEC 17025:2005 erteilt.

Im Februar 2021 erfolgte die Umstellung der Akkreditierung nach DIN EN ISO/IEC 17025:2018.

aj ist für folgende Leistungen akkreditiert:

  • Bestimmung des Windpotenzials und der Energieerträge von Windenergieanlagen
  • Bestimmung des Referenzertrages und der Standortgüte
  • Durchführung vom Windmessungen mittels Sodar
  • Auswertung von Windmessungen mittels Windmessmast, Sodar und Lidar
  • Bestimmung der Turbulenzintensität mittels Messung für die Prüfung der Standorteignung von Windenergieanlagen.

Hier finden Sie die aktuelle Akkreditierungsurkunde sowie einen Leitfaden zum implementierten Beschwerdemanagement der aj zum Download.[:]

Qualitätsmanagement

[:de]

Effiziente Lösungen auch bei komplexen Aufgaben, zusammen mit unserem einzigartigen Sodar-Expertenwissen und einer hohen Genauigkeit bei Gutachten sind seit jeher Qualitätsmerkmale der aj.

Im Jahre 2018 wurde der anemos-jacob GmbH erstmals die Akkreditierung durch die Deutsche Akkreditierungsstelle (DAkkS) nach DIN EN ISO/IEC 17025:2005 erteilt.

Im Februar 2021 erfolgte die Umstellung der Akkreditierung nach DIN EN ISO/IEC 17025:2018.

aj ist für folgende Leistungen akkreditiert:

  • Bestimmung des Windpotenzials und der Energieerträge von Windenergieanlagen
  • Bestimmung des Referenzertrages und der Standortgüte
  • Durchführung vom Windmessungen mittels Sodar und Lidar
  • Auswertung von Windmessungen mittels Windmessmast, Sodar und Lidar
  • Bestimmung der Turbulenzintensität mittels Messung für die Prüfung der Standorteignung von Windenergieanlagen.

Hier finden Sie die aktuelle Akkreditierungsurkunde sowie einen Leitfaden zum implementierten Beschwerdemanagement der aj zum Download.[:en]

Effiziente Lösungen auch bei komplexen Aufgaben, zusammen mit unserem einzigartigen Sodar-Expertenwissen und einer hohen Genauigkeit bei Gutachten sind seit jeher Qualitätsmerkmale der aj.

Im Jahre 2018 wurde der anemos-jacob GmbH erstmals die Akkreditierung durch die Deutsche Akkreditierungsstelle (DAkks) nach DIN EN ISO/IEC 17025:2005 erteilt.

Im Februar 2021 erfolgte die Umstellung der Akkreditierung nach DIN EN ISO/IEC 17025:2018.

aj ist für folgende Leistungen akkreditiert:

  • Bestimmung des Windpotenzials und der Energieerträge von Windenergieanlagen
  • Bestimmung des Referenzertrages und der Standortgüte
  • Durchführung vom Windmessungen mittels Sodar
  • Auswertung von Windmessungen mittels Windmessmast, Sodar und Lidar
  • Bestimmung der Turbulenzintensität mittels Messung für die Prüfung der Standorteignung von Windenergieanlagen.

Hier finden Sie die aktuelle Akkreditierungsurkunde sowie einen Leitfaden zum implementierten Beschwerdemanagement der aj zum Download.[:]

[:de]Projekte[:en]Projects[:]